Works in Russia

List of the executed works in Russia

NN Date Enterprise Name of work Type of equipment Total working hours
RUSSIA
1. 1990-1993 Mosenergo TPS-8, 17, 20, 21 Diagnostics of heating surface tubes of boilers TP-96, TP-87, TP-230 100000 - 150000
2. 1991 Kirishi TPS Diagnostics of turbine rotors K-300 turbine 90000
3. 1991 Novo-Kuibyshevsk oil-refining plant Diagnostics of pipelines and heat exchangers
4. 1992 Perm TPS Diagnostics of elements of K-800 turbine of unit-2 K-800 turbine
5. 1992 Kurgan TPS Diagnostics of boiler drum BKZ-210 boiler
6. 1992 Tollyatti TPS Diagnostics of drum metal of TP-87 boiler #13 TP-87 boiler,
420 t/hour
100000
7. 1992 Omsk TPS-5 Diagnostics of main steam lines of unit-2
8. 1992 Kostroma TPS-2 Diagnostics of steam lines of BKZ-210 boiler #2 BKZ-210 boiler,
t/hour
9. 1992 Mosenergo TPS-3 Diagnostics of compressor rotors of gas-turbine # 1,3 GTC-100, GTC-150
10. 1992-1993 Zainsk TPS Diagnostics of elements of 200 MW turbine of unit-5,8 K-200 turbine 170000 - 195000
11. 1993 Perm TPS Diagnostics of elements of K-800 turbine unit-3 K-800 turbine
12. 1993 Severodvinsk TPS-2 Diagnostics of elements of PT-80/100-130 turbine PT-80 turbine 42000
13. 1993-1994 Severodvinsk TPS-2 Diagnostics of waterwall tubes of TGM-464 boiler TGM-464 boiler 500 t/h 85000
14. 1993 Nizhnekamsk TPS-2 Diagnostics of waterwall tubes of TGME-464 boiler TGME-464 boiler,
500 t/hour
80000
15. 1993 Mostransgaz, gas-turbine stations: Davudovskaya, Eletskaya Diagnostics of blades and other GT-25 and GTN-6 unit elements 25 MW, 6 MW
16. 1993-1994 Konakovo TPS Diagnostics of elements of K-300 turbine of unit-1, 3, 4 K-300  turbine 150000 - 170000
17. 1993-1994 Cherepovets TPS Diagnostics of elements of K-200 turbine of unit-2 K-200  turbine 100000
18. 1994 Konakovo TPS Diagnostics of steam superheater tubes of PK-41 boiler #3 PK-41 boiler,
300 MW
170000
19. 1994 Kostroma TPS Diagnostics of elements of 300 MW turbine of unit-3, 5 K-300  turbine 150000 - 160000
20. 1994 Kostroma TPS Diagnostics of steam superheater tubes of TGMP-1202 boiler #9 TGMP-1202 boiler, 1200 MW 80000
21. 1994 Pechora TPS Diagnostics of turbine rotors K-200 turbine 90000
22. 1994 Pechora TPS Diagnostics of waterwall tubes TGME-206 boiler 90000
23. 1994 Severodvinsk TPS-2 Diagnostics of rotors of T-100-130 turbine of unit-2 T-100  turbine 85000
24. 1995 Cherepovets TPS Diagnostics of steam lines of 200 MW of units #1, 2 200 MW 100000
25. 1995 Tver TPS Diagnostics of turbine PT-25 turbine 300000
26. 1995 Chelyabinsk TPS Diagnostics of water-fed pipelines   200000
27. 1995 South Uralskaya TPS  Diagnostics of framework of PK-33 boiler of unit-14, 15 PK-33 boiler 205000
28. 1995 Voskresensk plant of mineral fertilizers Diagnostics of absorption tower 15 years
29. 1995 Efremov chemical plant Diagnostics of dry stack 15 years
30. 1995-1996 Mosteploenergo Diagnostics of steam boilers DKVR-10/13
31. 1996 Cherepovets TPS Diagnostics of waterwall tubes TP-208 boiler 100000
32. 1996 Dyagilevskaya TPS Diagnostics of steam lines of turbine #3 and boiler #5 140000
33. 1996 Dyagilevskaya TPS Diagnostics of elements of PT-60 turbine PT-60 turbine 140000
34. 1996 Novo-Ryazanskaya TPS Diagnostics of steam pipelines of turbine #6
35. 1996 Tver TPS Diagnostics of drum metal TP-170 boiler 250000
36. 1996 Tambov TPS Diagnostics of turbine unit-7 PT-60 turbine  105000
37. 1996 Mosstroiplastmass Diagnostics of heat accumulator
38. 1996 Expocenter, Moscow Diagnostics of 2 km of pipelines 20 years
39. 1996 Yaroslavl TPS-2 Diagnostics of turbine rotors PT-60 turbine
40. 1996 Voronezh TPS Diagnostics of waterwall tubes of TP-170 boiler TP-170 boiler
41. 1996 Severodvinsk TPS-2 Diagnostics of network pipelines 20 years
42. 1997 Vladimir TPS Diagnostics of waterwall tubes of TPE-430/A boiler TPE-430/A boiler,
500 t/h
6000
43. 1997 Arkhangelsk TPS Diagnostics of HP-cylinder, stopper and adjusting valves, bearing housing PT-60-130/13 turbine 150704
44. 1997 Arkhangelsk TPS Diagnostics of steam cross-over tubes of turbine PT-60-130/13 turbine
45. 1997 Kotlass cellulose-paper plant, TPS Diagnostics of elements of PT-60-130/13 turbine PT-60 turbine 215000
46. 1997 Gorky automobile plant, TPS Control of heating surface tubes of boilers of unit-14, 15 TGM-96/B boilers 133000, 113000
47. 1997 Dyagilevskaya TPS Control of welded joints of steam lines of turbine #4 PT-60 turbine 130000
48. 1997 Dyagilevskaya TPS Control of output stage of steam superheater BKZ-320GM boiler 140000
49. 1997 Dyagilevskaya TPS Diagnostics of cross-over tubes of turbine #3 PT-60 turbine 150000
50. 1997 Severodvinsk TPS-2 Diagnostics of turbine rotors T-100-130  turbine 50000
51. 1997 TPS of "Severstal" Co. Control of rotors, cylinders, valves and steam lines T-100-130  turbine #7 210000
52. 1997 Cherepovets TPS Diagnostics of steam cooler of boilers of unit #3 200 MW boiler 130000
53. 1997-1999 Cherepovets TPS Diagnostics of turbine rotors K-200 turbine 130000
54. 1997 Tambov TPS Diagnostics of turbine rotors T-100-130 110000
55. 1998 Nevinomissky Azot Diagnostics of welded joints of ammonia converter 20000
56. 1999 Kandalaksha aluminum plant Diagnostics of hooks of hoisting buckets
57. 1999 Nevinomissky Azot Diagnostics of welded joints of HP vessel (wall’s height is 180 mm)
58. 1999 Sayano-Shushenskaya hydro-electric station Diagnostics of hydro-turbine blades and of load-carrying structure of MARHI
59. 1999 Oskol cement plant Diagnostics of ground-surface gas pipelines
60. 1999 Petrozavodsk TPS Diagnostics of stem lines
61. 1999 Mosteploenergo Diagnostics of waterwall tubes. Diagnostics of deaerators
62. 1999-2000 Cherepovets TPS Engineering diagnostics of rotors, boilers, superheater tubes, waterwalls K-200 unit 170000 h
63. 1999 Kirovo-Chepetsk chemical plant Technical diagnostics of boiler BGM-35M boiler
64. 1999 Firm "AGA" Diagnostics of welded joints and pipeline sections
65. 1999 Moscow underground Diagnostics of rails
66. 1999 Lipetsk TPS-2 Diagnostics of turbine rotors and axial channels T-100/110 turbine
67. 1999 Engineering technical center "NETEEL" Diagnostics of bearing girders of lifts
68. 1999 Bashkirenergo Diagnostics of waterwall tubes of PT-100 boiler PT-100 boiler
69. 1999 Krasnoyarskenergo Diagnostics of turbine blades
70. 1999 Konakovo TPS Diagnostics of turbine rotors K-300-240 unit
71. 1999 Arkhangelsk cellulose-paper plant Diagnostics of transporting screws
72. 1999 Rossosh plant of mineral fertilizers Diagnostics of welds
73. 1999 Dyagilevskaya TPS Diagnostics of rotors
Diagnostics of boilers
74. 1999 Plastic Co. Diagnostics of boilers and  pipelines
75. 2000 Permtransgaz, gas-turbine stations: Votkinsk, Ochistnye, Malaya purga Diagnostics of gas pipelines Pworking=40atm 20 years
76. 2000 Konakovo TPS Technical diagnostics of rotors, pipelines of unit #1 K-300-240 unit 190000
77. 2000 Volgotransgaz, Lyskovo gas-turbine station Estimation of stressed-strained state of process gas pipelines Pworking=41.2 atm more than 15 years
78. 2000 Mosstroiplastmass Technical diagnostics of heat storage (diameter 3 m) Pworking=10atm 20 years
79. 2000 Urengoigazprom Estimation of stressed-strained state of gas pipelines ⌀ 1000 mm
Pworking=40atm
25 years
80. 2000 Petrozavodsk TPS Technical diagnostics of rotors T-100-130 turbine 100000 h
81. 2000 Yamburggazprom Estimation of stressed-strained state of gas pipelines ⌀ 1000 mm
Pworking=40atm
20 years
82. 2000 Konakovo TPS Technical diagnostics of K-300-240 unit #8 K-300-240 unit
83. 2000 Kirishneft Technical diagnostics of high pressure vessels
84. 2001 Mosteploenergo Technical diagnostics of internal gas pipelines in boiler-house
85. 2001-2003 Konakovo TPS Diagnostics of turbine rotors and pipelines unit #3,5,6,7
86. 2001 Petrozavodsk TPS Technical diagnostics of rotors PT-60-130 turbine
87. 2001 Mosteploenergo Diagnostics of supporting structure of chimney
88. 2001 Orgenergogaz Technical measurements for detection of stress concentrators of production tree parts
89. 2001 Rezanoblgas Engineering diagnostics of high pressure gas pipelines
90. 2001 Mosstroiplastmass Technical diagnostics of steam heater
91. 2002 Novomoskovsky Azot Diagnostics of boiler-utilizer pipes of a large ammonia assembly
92. 2002,
2004
Urengoigazprom Assessment of technical state and life of pipelines
93. 2002 Severgazprom Diagnostics of butt-welded joints of input and output collectors of dust catchers KC-10
94. 2002 Novomoskovsky Azot Technical examination of "Nuovo Pignone" steam turbine
95. 2002,
2004
Cherepovets TPS Examination of boiler units, pipeline units #1,2,3 K-200-130
96. 2002-2004 Orgenergogaz MMM-inspection of production trees
97. 2002 Mosteploenergo Heating system section diagnostics
98. 2002 Mosstroiplastmass Inspection of stress concentration zones, hydraulic testing of storage heater
99. 2003 Cherepovets TPS Analysis of recovered blades
100. 2003-2004 Zainsk TPS Inspection of turbine generator rotor, st. #6,4,9
101. 2003 Dyagilevskaya TPS Technical diagnostics of boilers superheaters #5 & 6 and of network pipelines metal
102. 2003-2004 Konakovo TPS Inspection of boiler units metal, units #1,2,3 turbine
103. 2003 Moscow Power Institute (technical University) Investigation of stress concentrations and defects in metal and welded joints of mantle ring assemblies
104. 2003 Stroienergo Inspection of thermotechnical equipment. Investigation of physical-mechanical properties of metal structures of Moscow Planetarium
105. 2003 NefteGazService Experimental inspection of ⌀73x5,5mm, ⌀89x7,0mm, ⌀89x6,0mm pipes
106. 2003 Yaroslavl Electro Locomotive repairing Plant Inspection of locomotive power parts
107. 2003 Kaluga TsvetMet Obrabotka Experimental inspection of forming rolls
108. 2004 Dyagilevskaya TPS Inspection of turbine units metal state
109. 2004 Novomoskovsky Azot Examination of industrial safety of three heat exchangers and a boiler-utilizer
110. 2004 Severgazprom, Vuktylsk branch ⌀1-3 mm steel wire inspection
111. 2004 Oskolcement Inspection of overhead gas pipelines and gas pipelines within the territory of boiler and other workshops
112. 2005 Tomsktransgaz Examination, rejection and certification of used pipes on gas-main pipeline "Parabel-Kuzbas" ⌀720x7mm - 25 km; ⌀1020x12-14mm - 12 km
113. 2005-2006 Rezanoblgaz Technical state assessment and lifetime estimation of buried high-pressure gas pipelines ⌀720x7mm - 8 km 20 years
114. 2005 Orgenergogaz Experimental diagnostics of gas-main pipeline in conditions of re-insulation using scanner-defectoscope ⌀720; ⌀1020; ⌀1220 25-35 years
115. 2005 Yugtransgaz Inspection of pipes stored on RVU-3 territory
116. 2005 Caspigazprom Diagnostics of used pipes on gas-main pipeline "Makat- Northern Caucasia" ⌀1420mm - 2 km
117. 2005 Cherepovets TPS Inspection of working blades of LP rotor st.No.1 K-210-130 turbine
118. 2005 Dyagilevskaya TPS Inspection of black oil lines without insulation removal 2 km
119. 2005-2008 Konakovo TPS Diagnostics of turbine rotors of units No.2, 3, 6 K-300-240 unit
120. 2006 Dyagilevskaya TPS Inspection of steam by-pass pipes and main steam pipe
121. 2006 Volzhsky pipe plant Experimental diagnostics of long-length mandrels
122. 2006 Surgutneftegaz, branch "Fedorovskneft" Experimental diagnostics of buried sections of oil pipelines ⌀1020x10mm 20 years
123. 2006 Sibneftegaz Diagnostics of unit for starting treatment equipment ⌀1020x12.3mm, ⌀530x10mm
124. 2006-2007 Cherepovets TPS Inspection of metal and welded joints of turbine and boiler K-210-130 turbine
125. 2006 Cherepovets TPS Inspection of metal and welded joints of direct and reheat steam pipes TP-208 boiler
126. 2006-2008 Konakovo TPS Diagnostics of bends of steam by-pass pipes
127. 2006 Volgotransgaz Inspection of inlet and outlet pipelines of main manifolds "Progress", "Yamburg-Tula", "Urengoy-Center1", "Yamburg-Elets2" ⌀1420x18.7mm, ⌀1420x22.3mm
128. 2006 Veznikovskaya gas-turbine station Inspection in prospect-holes of gas pipeline bends ⌀1400mm
129. 2006 Orgsyntez Inspection of welds of vessels "filter - water separator" V-4656-TT Warner Lewis
130. 2006 Mosenergo Inspection of first stage filters FIPaI-1.4-0.6-Na
131. 2006 Lenorgenergogaz Inspection of used gas pipelines on production plant ⌀1020x11.5mm
132. 2006 Tomsktransgaz Engineering examination and rejection of pipes during overhaul of gas-main pipelines ⌀1020-1220mm - 30 km
133. 2007 Dyagilevskaya TPS Regulation of supporting and suspension system. Engineering examination of pressure vessels
134. 2007 Nortgaz Inspection of buried gas pipeline and condensate pipeline ⌀377; ⌀219 - 40 km 30 years
135. 2007 Kola NPP Inspection of tube bends and welds ⌀32; ⌀245
136. 2008 Cherepovets TPS Inspection of primary equipment and pipelines of power unit No.2 K-210-130 turbine
137. 2008 GAZEKS Engineering examination of buried gas pipelines ⌀108-377 mm -150 km 40 years
138. 2008 Rezanoblgaz Engineering examination of buried high-pressure gas pipelines 9 km
139. 2008-
2009
Tomsk engineering centre Examination of used pipes on gas-main pipelines of "Gazprom transgaz Tomsk" 8.7 km
140. 2009 Lenorgenergogaz Automated 100% inspection of pipes and longitudinal welds using scanner and TSC 6 km
141. 2009 Moscow consolidated energy company Non-destructive testing of pipeline metal and welds
142. 2009 Moscow heating system company Development of technique for lifetime estimation of hot-water system by non-contact magnetometric method
143. 2009-
2010
Dyagilevskaya TPS Engineering examination of turbine No.3 and boiler No.5, No.6 PT-60-130/13 turbine, BKZ-280-140 boiler
144. 2010 Babaev Confectionery Concern Engineering examination of equipment in chocolate department
145. 2010 Konakovo TPS Diagnostics of bends of steam by-pass pipes
146. 2010-
2011
Moscow heating system company Non-contact magnetometric diagnostics of buried hot water system ⌀219-1220 - 100 km
147. 2009-2011 "Vodokanal" of Korolev town Non-contact magnetometric diagnostics of water conduits 12 km
148. 2011-2012 Lukoil Non-contact magnetometric diagnostics of field pipelines ⌀530 mm - 197 km
149. 2011-2012 RusHydro Group Complex inspection of water turbines
150. 2012 Konakovo TPS Inspection of the turbine rotors elements
151. 2012 PromEnergoMash NDT during examination of industrial safety and technical diagnostics of the equipment
152. 2012 Perm TPS Inspection of the turbine rotors shaft K-800-240-5 turbine
153. 2012-2013 Stroyrekonstruktsiya Inspection of the base metal and welding joints of the pipelines
154. 2012 Lukoil Non-contact magnetometric diagnostics of field pipelines ⌀377 mm - 31 km
155. 2013 Melnikov Central RDIsteel-construction Stressed-strained state test of the steel construction
156. 2013 Gazprom transgaz Moscow Non-contact magnetometric diagnostics of the gas piping 10 km
157. 2013 Lipetsk TPS-2 Stressed-strained state test of the mazut tank bottom V=20000m3
158. 2013 Caspian pipeline consortium - Russia Inspection of T-bends, pipe bends and fittings 120 pieces. ⌀ 500-1200
159. 2013-2014 Chernyshov Plant Experimental inspection of motor blades
160. 2013-2014 Rosneft Diagnostics of tubing
161. 2014 Sayano-Shushenskaya hydro-electric station Diagnostics of hydroelectric generator components
162. 2014 Russian railway, Yaroslavl Inspection of rail track at proof ground 2 km
163. 2014 "ILIM" Group Experimental inspection of single-type shaft
164. 2014 Moscow consolidated energy company Non-contact magnetometric diagnostics of buried hot water system ⌀219-1220 – 182.2 km 18 years and more
165. 2015 Krasnoyarsk hydro-electric station Inspection of turbine blades РО 697-ВМ-750
166. 2015,
2018-2021
Kirovo-Chepetsk chemical plant Non-destructive testing of steam turbine blading
167. 2016 Moscow consolidated energy company Non-contact magnetometric diagnostics of heating system in polyurethane foam insulation ⌀89-630 mm - 16.19 km 18 years and more
168. 2016 Novyy Urengoy gas chemical complex Diagnostics of vessel welds
169. 2017 Stavrolen Inspection of columns welds
170. 2016-2018 NOVATEK Non-contact magnetometric diagnostics of oil pipeline in polyurethane foam insulation 120 km 2-3 years
171. 2016-2019 Cityenergo Inspection of header welds. Inspection of compressor shaft bearings and blades
172. 2016,
2019
Mosvodokanal Non-contact magnetometric diagnostics of water conduit ⌀1220 mm
⌀1400 mm
1 km
173. 2018 Mosoblgaz Complex inspection of gas pipelines. Non-contact magnetometric diagnostics 5 km 45 years
174. 2018 YARGEO LLC Inspection of rotor wheels
175. 2018 Company “Moscow - Red Hills” Diagnostics of heating-system water pipelines 26 years
176. 2018 Moscow oil refinery Assessment of stressed-strained state of vessel 35 years
177. 2019 YARGEO LLC Inspection of oil pipeline welds ⌀377 mm 3.5 years
178. 2019 Gazpromneft-Yamal LLC Magnetometric diagnostics of gas and oil pipelines in polyurethane foam insulation 25 km 2 years
179. 2020 YARGEO LLC Inspection of tanks.
NCMD of oil pipeline.
Inspection of inlet oil collection pipeline
1000, 10000 m3
⌀377 mm
⌀720 mm
1 km
5 years
4 years
5 years
180. 2021 Vyksa metallurgical plant Diagnostics of welded tubing
181. 2021 NOVATEK Inspection of condensate pipeline
182. 2021 NLMK Inspection of slabs
183. 2021 ROSSETI Moscow region Non-contact magnetometric diagnostics of pipelines