Works in Russia
List of the executed works in Russia
NN | Date | Enterprise | Name of work | Type of equipment | Total working hours |
---|---|---|---|---|---|
RUSSIA |
|||||
1. | 1990-1993 | Mosenergo TPS-8, 17, 20, 21 | Diagnostics of heating surface tubes of boilers | TP-96, TP-87, TP-230 | 100000 - 150000 |
2. | 1991 | Kirishi TPS | Diagnostics of turbine rotors | K-300 turbine | 90000 |
3. | 1991 | Novo-Kuibyshevsk oil-refining plant | Diagnostics of pipelines and heat exchangers | ||
4. | 1992 | Perm TPS | Diagnostics of elements of K-800 turbine of unit-2 | K-800 turbine | |
5. | 1992 | Kurgan TPS | Diagnostics of boiler drum | BKZ-210 boiler | |
6. | 1992 | Tollyatti TPS | Diagnostics of drum metal of TP-87 boiler #13 | TP-87 boiler, 420 t/hour |
100000 |
7. | 1992 | Omsk TPS-5 | Diagnostics of main steam lines of unit-2 | ||
8. | 1992 | Kostroma TPS-2 | Diagnostics of steam lines of BKZ-210 boiler #2 | BKZ-210 boiler, t/hour |
|
9. | 1992 | Mosenergo TPS-3 | Diagnostics of compressor rotors of gas-turbine # 1,3 | GTC-100, GTC-150 | |
10. | 1992-1993 | Zainsk TPS | Diagnostics of elements of 200 MW turbine of unit-5,8 | K-200 turbine | 170000 - 195000 |
11. | 1993 | Perm TPS | Diagnostics of elements of K-800 turbine unit-3 | K-800 turbine | |
12. | 1993 | Severodvinsk TPS-2 | Diagnostics of elements of PT-80/100-130 turbine | PT-80 turbine | 42000 |
13. | 1993-1994 | Severodvinsk TPS-2 | Diagnostics of waterwall tubes of TGM-464 boiler | TGM-464 boiler 500 t/h | 85000 |
14. | 1993 | Nizhnekamsk TPS-2 | Diagnostics of waterwall tubes of TGME-464 boiler | TGME-464 boiler, 500 t/hour |
80000 |
15. | 1993 | Mostransgaz, gas-turbine stations: Davudovskaya, Eletskaya | Diagnostics of blades and other GT-25 and GTN-6 unit elements | 25 MW, 6 MW | |
16. | 1993-1994 | Konakovo TPS | Diagnostics of elements of K-300 turbine of unit-1, 3, 4 | K-300 turbine | 150000 - 170000 |
17. | 1993-1994 | Cherepovets TPS | Diagnostics of elements of K-200 turbine of unit-2 | K-200 turbine | 100000 |
18. | 1994 | Konakovo TPS | Diagnostics of steam superheater tubes of PK-41 boiler #3 | PK-41 boiler, 300 MW |
170000 |
19. | 1994 | Kostroma TPS | Diagnostics of elements of 300 MW turbine of unit-3, 5 | K-300 turbine | 150000 - 160000 |
20. | 1994 | Kostroma TPS | Diagnostics of steam superheater tubes of TGMP-1202 boiler #9 | TGMP-1202 boiler, 1200 MW | 80000 |
21. | 1994 | Pechora TPS | Diagnostics of turbine rotors | K-200 turbine | 90000 |
22. | 1994 | Pechora TPS | Diagnostics of waterwall tubes | TGME-206 boiler | 90000 |
23. | 1994 | Severodvinsk TPS-2 | Diagnostics of rotors of T-100-130 turbine of unit-2 | T-100 turbine | 85000 |
24. | 1995 | Cherepovets TPS | Diagnostics of steam lines of 200 MW of units #1, 2 | 200 MW | 100000 |
25. | 1995 | Tver TPS | Diagnostics of turbine | PT-25 turbine | 300000 |
26. | 1995 | Chelyabinsk TPS | Diagnostics of water-fed pipelines | 200000 | |
27. | 1995 | South Uralskaya TPS | Diagnostics of framework of PK-33 boiler of unit-14, 15 | PK-33 boiler | 205000 |
28. | 1995 | Voskresensk plant of mineral fertilizers | Diagnostics of absorption tower | 15 years | |
29. | 1995 | Efremov chemical plant | Diagnostics of dry stack | 15 years | |
30. | 1995-1996 | Mosteploenergo | Diagnostics of steam boilers | DKVR-10/13 | |
31. | 1996 | Cherepovets TPS | Diagnostics of waterwall tubes | TP-208 boiler | 100000 |
32. | 1996 | Dyagilevskaya TPS | Diagnostics of steam lines of turbine #3 and boiler #5 | 140000 | |
33. | 1996 | Dyagilevskaya TPS | Diagnostics of elements of PT-60 turbine | PT-60 turbine | 140000 |
34. | 1996 | Novo-Ryazanskaya TPS | Diagnostics of steam pipelines of turbine #6 | ||
35. | 1996 | Tver TPS | Diagnostics of drum metal | TP-170 boiler | 250000 |
36. | 1996 | Tambov TPS | Diagnostics of turbine unit-7 | PT-60 turbine | 105000 |
37. | 1996 | Mosstroiplastmass | Diagnostics of heat accumulator | ||
38. | 1996 | Expocenter, Moscow | Diagnostics of 2 km of pipelines | 20 years | |
39. | 1996 | Yaroslavl TPS-2 | Diagnostics of turbine rotors | PT-60 turbine | |
40. | 1996 | Voronezh TPS | Diagnostics of waterwall tubes of TP-170 boiler | TP-170 boiler | |
41. | 1996 | Severodvinsk TPS-2 | Diagnostics of network pipelines | 20 years | |
42. | 1997 | Vladimir TPS | Diagnostics of waterwall tubes of TPE-430/A boiler | TPE-430/A boiler, 500 t/h |
6000 |
43. | 1997 | Arkhangelsk TPS | Diagnostics of HP-cylinder, stopper and adjusting valves, bearing housing | PT-60-130/13 turbine | 150704 |
44. | 1997 | Arkhangelsk TPS | Diagnostics of steam cross-over tubes of turbine | PT-60-130/13 turbine | |
45. | 1997 | Kotlass cellulose-paper plant, TPS | Diagnostics of elements of PT-60-130/13 turbine | PT-60 turbine | 215000 |
46. | 1997 | Gorky automobile plant, TPS | Control of heating surface tubes of boilers of unit-14, 15 | TGM-96/B boilers | 133000, 113000 |
47. | 1997 | Dyagilevskaya TPS | Control of welded joints of steam lines of turbine #4 | PT-60 turbine | 130000 |
48. | 1997 | Dyagilevskaya TPS | Control of output stage of steam superheater | BKZ-320GM boiler | 140000 |
49. | 1997 | Dyagilevskaya TPS | Diagnostics of cross-over tubes of turbine #3 | PT-60 turbine | 150000 |
50. | 1997 | Severodvinsk TPS-2 | Diagnostics of turbine rotors | T-100-130 turbine | 50000 |
51. | 1997 | TPS of "Severstal" Co. | Control of rotors, cylinders, valves and steam lines | T-100-130 turbine #7 | 210000 |
52. | 1997 | Cherepovets TPS | Diagnostics of steam cooler of boilers of unit #3 | 200 MW boiler | 130000 |
53. | 1997-1999 | Cherepovets TPS | Diagnostics of turbine rotors | K-200 turbine | 130000 |
54. | 1997 | Tambov TPS | Diagnostics of turbine rotors | T-100-130 | 110000 |
55. | 1998 | Nevinomissky Azot | Diagnostics of welded joints of ammonia converter | 20000 | |
56. | 1999 | Kandalaksha aluminum plant | Diagnostics of hooks of hoisting buckets | ||
57. | 1999 | Nevinomissky Azot | Diagnostics of welded joints of HP vessel (wall’s height is 180 mm) | ||
58. | 1999 | Sayano-Shushenskaya hydro-electric station | Diagnostics of hydro-turbine blades and of load-carrying structure of MARHI | ||
59. | 1999 | Oskol cement plant | Diagnostics of ground-surface gas pipelines | ||
60. | 1999 | Petrozavodsk TPS | Diagnostics of stem lines | ||
61. | 1999 | Mosteploenergo | Diagnostics of waterwall tubes. Diagnostics of deaerators | ||
62. | 1999-2000 | Cherepovets TPS | Engineering diagnostics of rotors, boilers, superheater tubes, waterwalls | K-200 unit | 170000 h |
63. | 1999 | Kirovo-Chepetsk chemical plant | Technical diagnostics of boiler | BGM-35M boiler | |
64. | 1999 | Firm "AGA" | Diagnostics of welded joints and pipeline sections | ||
65. | 1999 | Moscow underground | Diagnostics of rails | ||
66. | 1999 | Lipetsk TPS-2 | Diagnostics of turbine rotors and axial channels | T-100/110 turbine | |
67. | 1999 | Engineering technical center "NETEEL" | Diagnostics of bearing girders of lifts | ||
68. | 1999 | Bashkirenergo | Diagnostics of waterwall tubes of PT-100 boiler | PT-100 boiler | |
69. | 1999 | Krasnoyarskenergo | Diagnostics of turbine blades | ||
70. | 1999 | Konakovo TPS | Diagnostics of turbine rotors | K-300-240 unit | |
71. | 1999 | Arkhangelsk cellulose-paper plant | Diagnostics of transporting screws | ||
72. | 1999 | Rossosh plant of mineral fertilizers | Diagnostics of welds | ||
73. | 1999 | Dyagilevskaya TPS | Diagnostics of rotors Diagnostics of boilers |
||
74. | 1999 | Plastic Co. | Diagnostics of boilers and pipelines | ||
75. | 2000 | Permtransgaz, gas-turbine stations: Votkinsk, Ochistnye, Malaya purga | Diagnostics of gas pipelines | Pworking=40atm | 20 years |
76. | 2000 | Konakovo TPS | Technical diagnostics of rotors, pipelines of unit #1 | K-300-240 unit | 190000 |
77. | 2000 | Volgotransgaz, Lyskovo gas-turbine station | Estimation of stressed-strained state of process gas pipelines | Pworking=41.2 atm | more than 15 years |
78. | 2000 | Mosstroiplastmass | Technical diagnostics of heat storage (diameter 3 m) | Pworking=10atm | 20 years |
79. | 2000 | Urengoigazprom | Estimation of stressed-strained state of gas pipelines | ⌀ 1000 mm Pworking=40atm |
25 years |
80. | 2000 | Petrozavodsk TPS | Technical diagnostics of rotors | T-100-130 turbine | 100000 h |
81. | 2000 | Yamburggazprom | Estimation of stressed-strained state of gas pipelines | ⌀ 1000 mm Pworking=40atm |
20 years |
82. | 2000 | Konakovo TPS | Technical diagnostics of K-300-240 unit #8 | K-300-240 unit | |
83. | 2000 | Kirishneft | Technical diagnostics of high pressure vessels | ||
84. | 2001 | Mosteploenergo | Technical diagnostics of internal gas pipelines in boiler-house | ||
85. | 2001-2003 | Konakovo TPS | Diagnostics of turbine rotors and pipelines unit #3,5,6,7 | ||
86. | 2001 | Petrozavodsk TPS | Technical diagnostics of rotors | PT-60-130 turbine | |
87. | 2001 | Mosteploenergo | Diagnostics of supporting structure of chimney | ||
88. | 2001 | Orgenergogaz | Technical measurements for detection of stress concentrators of production tree parts | ||
89. | 2001 | Rezanoblgas | Engineering diagnostics of high pressure gas pipelines | ||
90. | 2001 | Mosstroiplastmass | Technical diagnostics of steam heater | ||
91. | 2002 | Novomoskovsky Azot | Diagnostics of boiler-utilizer pipes of a large ammonia assembly | ||
92. | 2002, 2004 |
Urengoigazprom | Assessment of technical state and life of pipelines | ||
93. | 2002 | Severgazprom | Diagnostics of butt-welded joints of input and output collectors of dust catchers | KC-10 | |
94. | 2002 | Novomoskovsky Azot | Technical examination of "Nuovo Pignone" steam turbine | ||
95. | 2002, 2004 |
Cherepovets TPS | Examination of boiler units, pipeline units #1,2,3 | K-200-130 | |
96. | 2002-2004 | Orgenergogaz | MMM-inspection of production trees | ||
97. | 2002 | Mosteploenergo | Heating system section diagnostics | ||
98. | 2002 | Mosstroiplastmass | Inspection of stress concentration zones, hydraulic testing of storage heater | ||
99. | 2003 | Cherepovets TPS | Analysis of recovered blades | ||
100. | 2003-2004 | Zainsk TPS | Inspection of turbine generator rotor, st. #6,4,9 | ||
101. | 2003 | Dyagilevskaya TPS | Technical diagnostics of boilers superheaters #5 & 6 and of network pipelines metal | ||
102. | 2003-2004 | Konakovo TPS | Inspection of boiler units metal, units #1,2,3 turbine | ||
103. | 2003 | Moscow Power Institute (technical University) | Investigation of stress concentrations and defects in metal and welded joints of mantle ring assemblies | ||
104. | 2003 | Stroienergo | Inspection of thermotechnical equipment. Investigation of physical-mechanical properties of metal structures of Moscow Planetarium | ||
105. | 2003 | NefteGazService | Experimental inspection of ⌀73x5,5mm, ⌀89x7,0mm, ⌀89x6,0mm pipes | ||
106. | 2003 | Yaroslavl Electro Locomotive repairing Plant | Inspection of locomotive power parts | ||
107. | 2003 | Kaluga TsvetMet Obrabotka | Experimental inspection of forming rolls | ||
108. | 2004 | Dyagilevskaya TPS | Inspection of turbine units metal state | ||
109. | 2004 | Novomoskovsky Azot | Examination of industrial safety of three heat exchangers and a boiler-utilizer | ||
110. | 2004 | Severgazprom, Vuktylsk branch | ⌀1-3 mm steel wire inspection | ||
111. | 2004 | Oskolcement | Inspection of overhead gas pipelines and gas pipelines within the territory of boiler and other workshops | ||
112. | 2005 | Tomsktransgaz | Examination, rejection and certification of used pipes on gas-main pipeline "Parabel-Kuzbas" | ⌀720x7mm - 25 km; ⌀1020x12-14mm - 12 km | |
113. | 2005-2006 | Rezanoblgaz | Technical state assessment and lifetime estimation of buried high-pressure gas pipelines | ⌀720x7mm - 8 km | 20 years |
114. | 2005 | Orgenergogaz | Experimental diagnostics of gas-main pipeline in conditions of re-insulation using scanner-defectoscope | ⌀720; ⌀1020; ⌀1220 | 25-35 years |
115. | 2005 | Yugtransgaz | Inspection of pipes stored on RVU-3 territory | ||
116. | 2005 | Caspigazprom | Diagnostics of used pipes on gas-main pipeline "Makat- Northern Caucasia" | ⌀1420mm - 2 km | |
117. | 2005 | Cherepovets TPS | Inspection of working blades of LP rotor st.No.1 | K-210-130 turbine | |
118. | 2005 | Dyagilevskaya TPS | Inspection of black oil lines without insulation removal | 2 km | |
119. | 2005-2008 | Konakovo TPS | Diagnostics of turbine rotors of units No.2, 3, 6 | K-300-240 unit | |
120. | 2006 | Dyagilevskaya TPS | Inspection of steam by-pass pipes and main steam pipe | ||
121. | 2006 | Volzhsky pipe plant | Experimental diagnostics of long-length mandrels | ||
122. | 2006 | Surgutneftegaz, branch "Fedorovskneft" | Experimental diagnostics of buried sections of oil pipelines | ⌀1020x10mm | 20 years |
123. | 2006 | Sibneftegaz | Diagnostics of unit for starting treatment equipment | ⌀1020x12.3mm, ⌀530x10mm | |
124. | 2006-2007 | Cherepovets TPS | Inspection of metal and welded joints of turbine and boiler | K-210-130 turbine | |
125. | 2006 | Cherepovets TPS | Inspection of metal and welded joints of direct and reheat steam pipes | TP-208 boiler | |
126. | 2006-2008 | Konakovo TPS | Diagnostics of bends of steam by-pass pipes | ||
127. | 2006 | Volgotransgaz | Inspection of inlet and outlet pipelines of main manifolds "Progress", "Yamburg-Tula", "Urengoy-Center1", "Yamburg-Elets2" | ⌀1420x18.7mm, ⌀1420x22.3mm | |
128. | 2006 | Veznikovskaya gas-turbine station | Inspection in prospect-holes of gas pipeline bends | ⌀1400mm | |
129. | 2006 | Orgsyntez | Inspection of welds of vessels "filter - water separator" | V-4656-TT Warner Lewis | |
130. | 2006 | Mosenergo | Inspection of first stage filters | FIPaI-1.4-0.6-Na | |
131. | 2006 | Lenorgenergogaz | Inspection of used gas pipelines on production plant | ⌀1020x11.5mm | |
132. | 2006 | Tomsktransgaz | Engineering examination and rejection of pipes during overhaul of gas-main pipelines | ⌀1020-1220mm - 30 km | |
133. | 2007 | Dyagilevskaya TPS | Regulation of supporting and suspension system. Engineering examination of pressure vessels | ||
134. | 2007 | Nortgaz | Inspection of buried gas pipeline and condensate pipeline | ⌀377; ⌀219 - 40 km | 30 years |
135. | 2007 | Kola NPP | Inspection of tube bends and welds | ⌀32; ⌀245 | |
136. | 2008 | Cherepovets TPS | Inspection of primary equipment and pipelines of power unit No.2 | K-210-130 turbine | |
137. | 2008 | GAZEKS | Engineering examination of buried gas pipelines | ⌀108-377 mm -150 km | 40 years |
138. | 2008 | Rezanoblgaz | Engineering examination of buried high-pressure gas pipelines | 9 km | |
139. | 2008- 2009 |
Tomsk engineering centre | Examination of used pipes on gas-main pipelines of "Gazprom transgaz Tomsk" | 8.7 km | |
140. | 2009 | Lenorgenergogaz | Automated 100% inspection of pipes and longitudinal welds using scanner and TSC | 6 km | |
141. | 2009 | Moscow consolidated energy company | Non-destructive testing of pipeline metal and welds | ||
142. | 2009 | Moscow heating system company | Development of technique for lifetime estimation of hot-water system by non-contact magnetometric method | ||
143. | 2009- 2010 |
Dyagilevskaya TPS | Engineering examination of turbine No.3 and boiler No.5, No.6 | PT-60-130/13 turbine, BKZ-280-140 boiler | |
144. | 2010 | Babaev Confectionery Concern | Engineering examination of equipment in chocolate department | ||
145. | 2010 | Konakovo TPS | Diagnostics of bends of steam by-pass pipes | ||
146. | 2010- 2011 |
Moscow heating system company | Non-contact magnetometric diagnostics of buried hot water system | ⌀219-1220 - 100 km | |
147. | 2009-2011 | "Vodokanal" of Korolev town | Non-contact magnetometric diagnostics of water conduits | 12 km | |
148. | 2011-2012 | Lukoil | Non-contact magnetometric diagnostics of field pipelines | ⌀530 mm - 197 km | |
149. | 2011-2012 | RusHydro Group | Complex inspection of water turbines | ||
150. | 2012 | Konakovo TPS | Inspection of the turbine rotors elements | ||
151. | 2012 | PromEnergoMash | NDT during examination of industrial safety and technical diagnostics of the equipment | ||
152. | 2012 | Perm TPS | Inspection of the turbine rotors shaft | K-800-240-5 turbine | |
153. | 2012-2013 | Stroyrekonstruktsiya | Inspection of the base metal and welding joints of the pipelines | ||
154. | 2012 | Lukoil | Non-contact magnetometric diagnostics of field pipelines | ⌀377 mm - 31 km | |
155. | 2013 | Melnikov Central RDIsteel-construction | Stressed-strained state test of the steel construction | ||
156. | 2013 | Gazprom transgaz Moscow | Non-contact magnetometric diagnostics of the gas piping | 10 km | |
157. | 2013 | Lipetsk TPS-2 | Stressed-strained state test of the mazut tank bottom | V=20000m3 | |
158. | 2013 | Caspian pipeline consortium - Russia | Inspection of T-bends, pipe bends and fittings | 120 pieces. ⌀ 500-1200 | |
159. | 2013-2014 | Chernyshov Plant | Experimental inspection of motor blades | ||
160. | 2013-2014 | Rosneft | Diagnostics of tubing | ||
161. | 2014 | Sayano-Shushenskaya hydro-electric station | Diagnostics of hydroelectric generator components | ||
162. | 2014 | Russian railway, Yaroslavl | Inspection of rail track at proof ground | 2 km | |
163. | 2014 | "ILIM" Group | Experimental inspection of single-type shaft | ||
164. | 2014 | Moscow consolidated energy company | Non-contact magnetometric diagnostics of buried hot water system | ⌀219-1220 – 182.2 km | 18 years and more |
165. | 2015 | Krasnoyarsk hydro-electric station | Inspection of turbine blades | РО 697-ВМ-750 | |
166. | 2015, 2018-2021 |
Kirovo-Chepetsk chemical plant | Non-destructive testing of steam turbine blading | ||
167. | 2016 | Moscow consolidated energy company | Non-contact magnetometric diagnostics of heating system in polyurethane foam insulation | ⌀89-630 mm - 16.19 km | 18 years and more |
168. | 2016 | Novyy Urengoy gas chemical complex | Diagnostics of vessel welds | ||
169. | 2017 | Stavrolen | Inspection of columns welds | ||
170. | 2016-2018 | NOVATEK | Non-contact magnetometric diagnostics of oil pipeline in polyurethane foam insulation | 120 km | 2-3 years |
171. | 2016-2019 | Cityenergo | Inspection of header welds. Inspection of compressor shaft bearings and blades | ||
172. | 2016, 2019 |
Mosvodokanal | Non-contact magnetometric diagnostics of water conduit | ⌀1220 mm ⌀1400 mm 1 km |
|
173. | 2018 | Mosoblgaz | Complex inspection of gas pipelines. Non-contact magnetometric diagnostics | 5 km | 45 years |
174. | 2018 | YARGEO LLC | Inspection of rotor wheels | ||
175. | 2018 | Company “Moscow - Red Hills” | Diagnostics of heating-system water pipelines | 26 years | |
176. | 2018 | Moscow oil refinery | Assessment of stressed-strained state of vessel | 35 years | |
177. | 2019 | YARGEO LLC | Inspection of oil pipeline welds | ⌀377 mm | 3.5 years |
178. | 2019 | Gazpromneft-Yamal LLC | Magnetometric diagnostics of gas and oil pipelines in polyurethane foam insulation | 25 km | 2 years |
179. | 2020 | YARGEO LLC | Inspection of tanks. NCMD of oil pipeline. Inspection of inlet oil collection pipeline |
1000, 10000 m3 ⌀377 mm ⌀720 mm 1 km |
5 years 4 years 5 years |
180. | 2021 | Vyksa metallurgical plant | Diagnostics of welded tubing | ||
181. | 2021 | NOVATEK | Inspection of condensate pipeline | ||
182. | 2021 | NLMK | Inspection of slabs | ||
183. | 2021 | ROSSETI Moscow region | Non-contact magnetometric diagnostics of pipelines |